Showing posts with label Carpentry. Show all posts
Showing posts with label Carpentry. Show all posts

Wednesday, July 23, 2014

Friday, June 6, 2014

SOBA washing machine

Installation of a washing machine in a Swan 60 galley.
Available locker was very tight and machine had to be installed on
slides so the buttons would be reachable.

Wednesday, April 9, 2014

Teak deck sanding

The carpernters finishing the teak deck sanding on
Swan 53 MERI BALLETTI

Friday, June 21, 2013

Pullman Berth

A new pullman berth has been manufactured and installed by our carpenters
on Swan 60-025 SEAWOLF 3

Tuesday, February 5, 2013

B&G electronics installation

B&G electronics replacement installation in progress
after lightening strike on Baltic 78 LAETITIA

Wednesday, January 16, 2013

B&G Zeus 12'

Modification of chart table shelves to fit a B&G Zeus 12'
(before dying and varnishing the board)

Tuesday, November 20, 2012

GRIMLO V blue lines

Mr. JP brushing the second coat of  blue paint on the lines...
Please do not disturb the artist at work  :-)

Tuesday, September 25, 2012

Monday, August 6, 2012

Laying teak deck

From the teak tree log to the deck




Sylvain adjusting teak slats

53-519 MUSIC

Jeremy adjusting a locker door
Laurent and Wesley reinstalling a door

Wednesday, May 30, 2012

Friday, May 11, 2012

Teak deck Hardware removal

Removing and reinstalling the deck hardware is probably
as time consuming than laying the teak deck itself.
Especially on some boats of that generation when the decks were
covered with winches, blocks, pad-eyes, clutches etc..
This is as well a good opportunity to renew some of the deck
equipment as winches or hatches.

A new teak deck for Swan 59 GRIMLO V

Tenting the boat in case it rains.Steel fittings bolted onto toerail have been
 fabricated to hold the PVC frame work and leave a bit more space inside.

Soon it will be hot in there though.