Showing posts with label Lamination. Show all posts
Showing posts with label Lamination. Show all posts

Tuesday, April 5, 2016

Swan 48 S&S ISBJÖRN

Rudders and bearings again.

Please see the Swan 48 S&S ISBJÖRN
rudder repair performed by crew and Antigua boats yard in the state of the art.
Very interesting and instructive indeed.
Thanks to them for posting such a comprehensive report that will shurely help other owner of Swan yachts of that generation how their rudder is installed and bearings made.

please follow here under link to find more about it.

http://59-north.com/sailfeed/2016/3/26/isbjorn-rudder-repair 


Friday, April 1, 2016

SOTO ACEBAL 62' Rudder

Rudder.. again.. on another type of boat with another type of bearing from JEFA bearings.
Some kind of an interesting "bricolage" where the bearing was replaced to some
nylon spacer... no need to say that helm was extremely hard..
Removal of aluminium sleeve

Lamination of GRP casing

New rudder post sleeve.
Adjustment of bearing
Rudder back in... :-) 

Friday, August 7, 2015

Friday, November 21, 2014

Carbon spinnaker pole lamination

When the spinnaker pole end fitting looks like this...
it is about time to replace it.
This happens because of corrosion between carbon and aluminium.
End of carbon pole is usually inflated because of
corrosion pushing and cracking away pole end.
it needs to be re-laminated... faired and painted
Final result with new Sparcraft mast end fitting.
A sheet of Tufnol™ has been added around fitting to insulate carbon and aluminium.

Monday, October 27, 2014

Mastervolt Lithium Ion batteries

Modification of battery box
Stéphane installing the batteries, breakers and relays
Mastervolt MLI ULTRA 24/5000 being isntalled in Swan 53 MUSIC

  • Highly advanced technology.
  • Multifunctional battery of 2.5 kWh or 5 kWh.
  • Saves up to 70% in space and weight.
  • Three times the lifespan of traditional batteries (2000 cycles).
  • Ultra-fast charging.
  • High efficiency.
  • MasterBus communication with every Mastervolt battery charger.
  • Integrated Battery Management System (BMS) and monitoring.
  • Series balancing technology optimizes string connection.
  • Safest Lithium Ion technology available.
  • Tested and certified according to UN38.3.
  • Two year warranty.

Please visit Mastervolt dedicated Web page HERE.

Tuesday, April 1, 2014

60-902 Racing forepeak

Switching the forepeak on 60-902 from a cruising to a racing version.
Stephan dismantling carpentry work, plumbing, tanks, toilet, pumps etc...
Vincent laminating new carbon floorboards and bunk
Vacuum applied to laminated floorboards
The new bunk boards
Captain Chris testing the new bunk... seems all right :-)
New lines carbon rack
Perspex plate protects electrical boxes 
The new "racing" forepeak and carbon home made floorboards.

Thursday, February 14, 2013

Hull lamination

Grinding damages around keel and in bilges to prepare lamination work.

Tuesday, February 12, 2013

Carbon mast instruments bracket

Vincent laminating to modify a carbon mast bracket
 to adapt Sailmon nav instruments displays

Thursday, July 28, 2011