Showing posts with label Rig. Show all posts
Showing posts with label Rig. Show all posts

Friday, April 1, 2016

441-023 Rig service


Getting seized tip cups out of spreaders ends.
Painted spreaders ends
Clean and polished rods, tip cups, tangs and turnbuckles
Reassembling rig before stepping

Wednesday, October 15, 2014

Thursday, July 17, 2014

Saturday, April 12, 2014

40-119 LADY KATHEA rig service

Mast unstepping
Goose and vang necks showing signs of corrosion.
Time for a good clean and insulation
Cleaning and polishing of goose neck and adding
a cut out of a sheet of Tufnol to insulate ssteel and mast aluminium
Dye testing rod heads. Above one obviously showing a crack
Forestay rod lower head showing signs of excessive stress.
Forestay usually being the most stressed part of the rig.
Reinstalling goose neck with Tufnol sheet insulation and
helicoils on some of the screws threads

Wednesday, February 12, 2014

Mast unstepping

Laurent installing the slings around carbon mast of
Swan 60-028 CIGNO ROSSO
Time for a rig check before the season starts
Coming out
Quite a tall mast actually ;-)
Not much space left around

Thursday, August 1, 2013

40-146 BLUE CHIP Rig service

Laurent hooking the mast
One should not wait until everything is seized before servicing.
Should be done every 5-6 years.
Polishing rods and fittings
Spreaders ends damaged with corrosion.
It took a blowtorch to remove tip cups :-(

Friday, June 14, 2013

Navtec Rod rigging re-heading

Cutting rod heads
Pressing the new heads
The Navtec facility in Mandelieu, close to Cannes,
in the heart of the french riviera yachting industry.

Tuesday, April 30, 2013

Navtec TFC™ Rigging

Navtec Thermo Fused Carbon Rigging spreaders ends fittings
on Swan 90-702 discontinuous rig

Mast on the ground in La Ciotat
Lifting mast with the huge La Ciotat cranes
Mast coming in with Rogi Yacht Rigging team at work
Neat V and D1's deck turnbuckles


Please visit Navtec web site to read more about TFC™ Rigging

Wednesday, April 24, 2013

Stepping the mast of 46-422

Stepping the mast of Swan 46-422 LA LUCIOLE  in La  Rochelle
on the Atlantic coast of France after the rig was serviced and the mast repainted
at chantier TECHNIYACHTS PINTA

Wednesday, March 13, 2013

Swan 90 mast unstepping

Mast coming out
Using the big cranes in La Ciotat
the 39mtrs mast would almost look short
Hauling out Swan 90-708
for antifouling paint

Friday, January 25, 2013

46-422 Rig service

Hauling out Swan 461 in La Rochelle (Atlantic coast) after mast unstepping. 461-422 is a daggerboard boat.
Yes, we do travel "abroad" when asked for it :-) 
Mast after rig and equipments removal
Time for a good paint treatment
Rod rigging and heads inspection