Friday, October 22, 2010
78-001 VALKYRIE
Getting out a 78ft boat (lifting keel) of that tight space
is quite a challenge
Capt. Peter manoeuvering
80-001 finishing repair
Vincent reinstalling the hardware after lamination
and painting of the repair
Thursday, October 21, 2010
80-101 BERENICE mast tuning
Mastervolt technician Jean-Marc explaining to Stephane & Fabrizio
the new Mastervolt network monitoring software
Performance Greement tuning the mast after forestay reinstallation
Laurent & Olof having fun on BERENICE deck
66-706 GODOT leaves Villefranche
GODOT leaves Villefranche for a circumnavigation. Farewell!
Wednesday, October 20, 2010
90-709 antifouling paint
90-709 at AMC Antibes
Swan 90 bow
90-709 in the slings
How to remove a stuck rudder bearing because of an encounter
with an unknown floating object
4 boats at the end of the catway
Swan bows
90-702 + 80-101 + 80-001 + 66-706
Hall Spars & Rigging technician replacing a carbon foil part.
Thursday, October 14, 2010
80-101 BERENICE
Finnish hydraulics engineers tuning up 80-101 winches
90-709 NEFERTITI mast tuning
Performance Greement tuning the rig. Pumping up mast.
Olof installing a fire extinguisher cover
Tuesday, October 12, 2010
57-202 ANOUK mast unstepping
Villefranche crane can handle a Swan 57 mast
Mast coming out - Hold on Laurent!
JC - Laurent - Denis and crane man Pascal
Accastillage Bernard technician tuning the anchor arm
Wednesday, October 6, 2010
80-001 + 90-702 + 90-709 at the end of the catway
66-706 GODOT + 78-001 Custom Tripp VALKYRIE
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)