Wednesday, February 12, 2014

Yanmar Engine lifting

Engine coming out the companion way.
Engine smooth landing
Time for a good engine refit. Sandblast mounts and steel supports. Check for cracks and paint.
Dismantle engine, refit and paint.

Mast unstepping

Laurent installing the slings around carbon mast of
Swan 60-028 CIGNO ROSSO
Time for a rig check before the season starts
Coming out
Quite a tall mast actually ;-)
Not much space left around

Friday, December 6, 2013

Workshops building renovation

The workshop buildings being renovated as they were
before being damaged by world war two bombings.
The original buildings and dry dock in 1726
when Villefranche was already a refit place for ships.
Galley ships at the time.
The drydock was working exactly the same way as nowadays and was even covered with a roof.

Thursday, November 7, 2013

Swan 60's bows

Swan 60's bows reflecting in the water
showing bows design evolution over the past 10 years.

60-902 PETITE FLAMME

Arrival of Swan 60 PETITE FLAMME yesterday evening.
Welcome to Villefranche !

Wednesday, November 6, 2013

Bowthruster batteries

Improving bowthruster batteries capacity on a Swan 461 with adding 2 more batteries connected in "parallel/sery" to improve discharge repartition. Not such a frequent way of connecting batteries together but appropriate to get an even discharge when a heavy load is drawn as on bowthruster batteries.
Home made GRP battery box.
BERGAME leaving Villefranche

Swan 90 transoms