Tuesday, November 9, 2010
53-517 ILLUSION
JP repairing dings at bow and polishing topsides
Vincent laminating templates to make ssteel chafe protections
Thursday, November 4, 2010
461-406 Transport
46-406 AyAyAy mast stripping in Cogolin
Almost ready for truck transport to the Atlantic coast.
Friday, October 22, 2010
78-001 VALKYRIE
Getting out a 78ft boat (lifting keel) of that tight space
is quite a challenge
Capt. Peter manoeuvering
80-001 finishing repair
Vincent reinstalling the hardware after lamination
and painting of the repair
Thursday, October 21, 2010
80-101 BERENICE mast tuning
Mastervolt technician Jean-Marc explaining to Stephane & Fabrizio
the new Mastervolt network monitoring software
Performance Greement tuning the mast after forestay reinstallation
Laurent & Olof having fun on BERENICE deck
66-706 GODOT leaves Villefranche
GODOT leaves Villefranche for a circumnavigation. Farewell!
Wednesday, October 20, 2010
90-709 antifouling paint
90-709 at AMC Antibes
Swan 90 bow
90-709 in the slings
How to remove a stuck rudder bearing because of an encounter
with an unknown floating object
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)